Skip Navigation  

2012 Invitations for Bids

Invitation for Bids

Date Posted   

Open Date 

Emergency Power System @ John O'Connell HS (REBID) 11/06/2012 11/28/2012
Pre-Bid Conference Attendees 11/15/2012 11/14/2012
Bid Results 11/28/2012 11/28/2012

New Academic Campus @ 300 Seneca--Demolition Package

Job Walk 1

Job Walk 2

Addendum 1

Bid Result

Subcontractors List

10/29/2012 11/21/2012

Jose Ortega Elementary School-Security Camera Project

Job Walk 1

Job Walk 2

Bid Result

Subcontractors List

10/24/2012 11/21/2012

Sarah B. Cooper - Various Improvements

Job Walk 1

Job Walk 2

Addendum 1

Bid Result

Subcontractors List

10/24/2012 11/20/2012
New Willie L. Brown MS Pre-Qualified Design Builders 10/22/2012  

Monroe ES New Modular Two-Story Building

Job Walk 1

Job Walk 2

Bid Result

Subcontractors List

10/09/2012 10/30/2012

Student Nutrition Meal Services IFB

Bid Documents

Questions & Answers

Questions & Answers - Part No. 2

IFB MS-2012 Bid Addendum No. 1

IFB MS-2012 Bid Addendum No. 2

IFB MS-2012 21 Days Menu Cycles

IFB MS-25012 Revised Bid Sheets

Intent To Award Notice

10/09/2012

 

10/26/2012

11/02/2012

11/02/2012

11/02/2012

11/02/2012

11/02/2012

11/30/2012

11/13/2012

Emergency Power System @ John O'Connell HS

09/27/2012

10/10/2012

Pre-Bid Conference Attendees

09/27/2012

09/26/2012

Bid Results

10/15/2012

10/10/2012

ADA Site Improvements of Play Yard @ Lafayette ES

9/11/2012

10/03/2012

Pre Bid Conference Attendees

9/21/2012

9/19/2012
Bid Results 10/9/2012 10/3/2012

Reroofing Project of Nourse Adutiorium

8/16/2012

9/12/2012

Pre-Bid Conference Attendees

08/30/2012

08/29/2012

Bid Results

09/13/2012

09/12/2012

Ulloa ES Bungalow Replacement

Addendum No. 1

Job Walk 1 - 08 09 2012

Job Walk 2 - 08 16 2012

Addendum No. 2

Addendum No, 3

Addendum No, 4

BID DATE CHANGED TO: 8/28/2012

Bid Result

Subcontractors List

7/16/2012

8/28/2012

Reprographic Services RFP 2012

Addendum

Intent to Award Notice

07/10/2012

08/16/2012

09/26/2012

08/21/2012

Food and Food Supplies

7/10/2012

8/7/2012

Boiler Replacement @ Dr. Charles Drew College Prep Academy / BID RESULTS

06/21/2012

06/08/2012

New Computer Labs @ Various Sites/Bid Results

06/14/2012

06/08/2012

Student Nutrition Services - Boiler Replacement

 

 

Bid Results

6/8/2012

6/7/2012

Pavement Resurfacing & Repairs @ CDA/Marina Middle School

5/30/2012

5/24/2012

Bid Results

5/30/2012

5/24/2012

Virco Classroom Furniture Bid

Addendum No. 1

Question & Answer (Q&A)

Intent to Award

Bid Results

05/22/2012

05/24/2012

05/31/2012

06/12/2012

07/03/2012

06/06/2012

Cisco Hardware Bid 2012

Addendum No.1

Intent to Award

Bid Results

05/22/2012

05/23/2012

06/11/2012

07/03/2012

06/05/2012

Roosevelt MS Abatement Project

Addendum No. 1

Addendum No. 2

Sign In Sheet Preconstruction Meeting No. 1

Sign In Sheet Preconstruction Meeting No. 2

Bid Result

Sub Contractors List

05/17/2012 06/12/2012

Willie Brown Jr. MS Demolition Project

Job Walk Sign In Sheet

Job Walk Sign In Sheet 2

Bid Result

Subcontractors List

5/11/2012

6/5/2012

Sitework for Placement of New Relocatable Classroom Buildings @ Sunnyside ES

05/09/2012

05/23/2012

Pre-Bid Conference Attendees

05/09/2012

05/23/2012

Bid Results

05/24/2012

05/23/2012

Cleveland and Lakeshore Alternative Elementary School Boiler Replacement

Job Walk Sign-In Sheet May 16, 2012

Bid Result

5/7/2011

5/30/2012

Water Bottle Filling Station Installation at Six Sites

4/30/2012

05/30/2012

Addendum No. 1

05/232012

05/16/2012

Addendum No. 2

05/23/2012

05/23/2012

Bid Results

06/18/2012

06/08/2012

Re-bid of ADA Site Improvements of Play Yard & Restroom Renovation @ Frank McCoppin ES

04/26/2012

05/17/2012

Pre-Bid Conference Attendees

05/03/2012

05/17/2012

Emergency Showers @ Science Classrooms at Lowell High School

04/23/2012

05/02/2012

Pre-Bid Conference Attendees

04/23/2012

04/20/2012

Bid Results

05/04/2012

05/02/2012

Repair of Exterior Walls @ Independence High School

04/20/2012

05/01/2012

Pre-Bid Conference Attendees

04/20/2012

04/18/2012

Bid Results

05/01/2012

05/01/2012

JANITORIAL PAPER & SUPPLIES BID

Bid Documents

04/18/2012

05/03/2012

Lowell HS- Exterior Painting Project

Job Walk 1

Bid Result

Subcontractors List

Work Preservation Letter

4/5/2012

4/26/2012

Buena Vista CDC/Horace Mann MS Renovations for ES Expansion

04/02/2012

04/24/2012

Pre-B id Conference Attendees

04/10/2012

04/10/2012

Bid Results

04/26/2012

04/24/2012

Bid Results (UPDATED)

05/01/2012

04/24/2012

Argonne ES ADA Site Improvements of Play Yard

03/29/2012

04/25/2012

Pre-Bid Conference Attendees

04/11/2012

04/11/2012

SFUSD Flooring Projects at Three Sites

03/29/2012

05/08/2012

Bid Walk Agenda

04/24/2012

04/19/2012

 RUCKUS NETWORK HARDWARE

 

 

Bid Walk

04/24/2012

04/19/2012

Abraham Lincoln HS Increment 3 Project

Job Walk Sign In Sheet 1

Job Walk Sign In Sheet 2

Bid Result

Subcontractors List

 

3/28/2012

4/24/2012

SOTA Security Camera System Installation

03/27/2012

05/04/2012

Job Walk Agenda

04/12/2012

04/12/2012

Sutro ES Exterior & Interior Painting & Flooring Project

03/27/2012

04/18/2012

Job Walk #1

04/11/2012

04/18/2012

Job Walk #2

04/11/2012

04/18/2012

Bid Results

04/19/2012

04/18/2012

Renovations for SFIHS Expansion

03/20/2012

04/19/2012

Pre-Bid Conference Attendees

04/09/2012

04/19/2012

Bid Results

04/20/2012

04/19/2012

Martin Luther King MS Shade Replacement Project

Job Walk 1

3/15/2012

4/10/2012

Luther Burbank/ June Jorden School for Equity Digital Security Project

Addendum 1

Addendum 2

Job Walk 1

Job Walk 2

Bid Result

3/15/2012

4/10/2012

ADA Site Improvements of Play Yard & Restroom Renovation @ Frank McCoppin ES

03/09/2012

04/03/2012

Food & Food Supplies - Student Nutrition

Question & Answer

03/09/2012

04/02/2012

04/12/2012

Fairmount ES & Grattan ES Greening

Sign-In Sheet

Sign In Sheet 2

Bid Opening Postponed to April 5, 2012 at 2:00 p.m. (pls see attached email)

Bid Result

3/6/2012

3/29/2012

Rebid - ADA Site Improvements for Student Nutrition Services Facility

03/01/2012

03/27/2012

Bid Results

03/29/2012

03/27/2012

Claire Lilientahl ES John Muir ES Greening

Sign In Sheet

Sign-In Sheet 2

Labor Compliance Program

Bid Result

03/1/2012

4/04/2012

Dr. William Cobb ES Greening

Sign-In Sheet

Sign-In Sheet 2

Bid Result

Designated Subcontractors List

3/01/2012

03/28/2012

Alamo ES & Alice Fong Yu AS Greening

Sign-In Sheet

Sign In Sheet 2

Labor Compliance Program

Bid Result

03/1/2012

03/27/2012

Longfellow Building Maintenance & Seismic Strengthening

02/28/2012

03/21/2012

Bid Walk Agenda

03/01/2012

03/01/2012

Bid Walk No. 1

03/02/2012

03/01/2012

Bid Results

03/21/2012

03/21/2012

Play Yard Alterations @ Argonne Child Development Center

02/22/2012

03/22/2012

Bid Results

03/29/2012

03/22/2012

SFUSD Facilities Design & Construction : SOQ for Architectural Services

02/21/2012

03/20/2012

Window Replacement at McKinley ES

02/07/2012

02/28/2012

Bid Results

03/29/2012

02/28/2012

Pre-Bid Conference Attendees

02/10/2012

02/09/2012

Addendum No. 1

02/22/2012

02/28/2012

Addendum No. 2

02/22/2012

02/28/2012

Bid Results

03/6/2012

02/28/2012

Voluntary Partial Seismic Strengthening at Daniel Webster ES

02/07/2012

03/07/2012

Bid Walk February 15, 2012

02/16/2012

03/07/2012

Job Walk Agenda February 15, 2012

02/16/2012

03/07/2012

Bid Results

03/08/2012

03/07/2012

Window Replacement at McKinley ES

01/26/2012

02/28/2012

Bid Results

03/29/2012

02/28/2012

Chiller Replacement at 555 Franklin St. Administrative Officers , SF CA 94102

01/10/2012

02/09/2012

Bid Results

02/09/2012

02/09/2012

ADA Site Improvements for Student Nutrition Services Facility

01/04/2012

02/07/2012

Job Walk

01/18/2012

01/17/2012