Skip Navigation  

Current Invitations for Bids

Invitation for Bids

 

 

 

Date Posted

Open Date

Roosevelt MS Abatement Project   05/17/201206/12/2012

 Willie Brown Jr. MS Demolition Project

Job Walk Sign In Sheet

 

 

 

 5/11/2012

 6/5/2012

 Sitework for Placement of New Relocatable Classroom Buildings @ Sunnyside ES 

 

 

 

 05/09/2012 

 05/23/2012 

 Pre-Bid Conference Attendees 

 

 

 

 05/09/2012 

 05/23/2012 

 Cleveland and  Lakeshore Alternative Elementary School Boiler Replacement

Job Walk Sign-In Sheet May 16, 2012

 

 

 

 5/7/2011

 5/30/2012

 Water Bottle Filling Station Installation at Six Sites 

 

 

 

 4/30/2012 

 05/30/2012 

 Re-bid of ADA Site Improvements of Play Yard & Restroom Renovation @ Frank McCoppin ES 

 

 

 

 04/26/2012 

 05/17/2012 

 Pre-Bid Conference Attendees 

 

 

 

 05/03/2012 

 05/17/2012 

 Emergency Showers @ Science Classrooms at Lowell High School 

 

 

 

 04/23/2012 

 05/02/2012 

 Pre-Bid Conference Attendees 

 

 

 

 04/23/2012 

 04/20/2012 

 Bid Results 

 

 

 

 05/04/2012 

 05/02/2012 

 Repair of Exterior Walls @ Independence High School 

 

 

 

 04/20/2012 

 05/01/2012 

 Pre-Bid Conference Attendees 

 

 

 

 04/20/2012 

 04/18/2012 

 Bid Results 

 

 

 

 05/01/2012 

 05/01/2012 

 JANITORIAL PAPER & SUPPLIES BID

Bid Documents

 

 

 

 04/18/2012

 05/03/2012

 Lowell HS- Exterior Painting Project

Job Walk 1

Bid Result

 

 

 

 4/5/2012

 4/26/2012

 Buena Vista CDC/Horace Mann MS Renovations for ES Expansion 

 

 

 

 04/02/2012 

 04/24/2012 

 Pre-B id Conference Attendees 

 

 

 

 04/10/2012 

 04/10/2012 

 Bid Results 

 

 

 

 04/26/2012 

 04/24/2012 

 Bid Results  (UPDATED) 

 

 

 

 05/01/2012 

 04/24/2012 

 Argonne ES ADA Site Improvements of Play Yard 

 

 

 

 03/29/2012 

 04/25/2012 

 Pre-Bid Conference Attendees 

 

 

 

 04/11/2012 

 04/11/2012 

 SFUSD Flooring Projects at Three Sites 

 

 

 

 03/29/2012 

 05/08/2012 

 Bid Walk Agenda 

 

 

 

 04/24/2012 

 04/19/2012 

 Bid Walk 

 

 

 

 04/24/2012 

 04/19/2012 

Abraham Lincoln HS Increment 3 Project 

Job Walk Sign In Sheet 1

Job Walk Sign In Sheet 2

Bid Result

 

 

 

 3/28/2012

 4/24/2012

 SOTA Security Camera System Installation 

 

 

 

 03/27/2012 

 05/04/2012 

 Job Walk Agenda 

 

 

 

 04/12/2012 

 04/12/2012 

 Sutro ES Exterior & Interior Painting & Flooring Project 

 

 

 

 03/27/2012 

 04/18/2012 

 Job Walk #1 

 

 

 

 04/11/2012 

 04/18/2012 

 Job Walk #2 

 

 

 

 04/11/2012 

 04/18/2012 

 Bid Results 

 

 

 

 04/19/2012 

 04/18/2012 

 Renovations for SFIHS Expansion 

 

 

 

 03/20/2012 

 04/19/2012 

 Pre-Bid Conference Attendees 

 

 

 

 04/09/2012 

 04/19/2012 

 Bid Results 

 

 

 

 04/20/2012 

 04/19/2012 

 Martin Luther King MS Shade Replacement Project

Job Walk 1

 

 

 

 3/15/2012

 4/10/2012

 Luther Burbank/ June Jorden School for Equity Digital Security Project

Addendum 1

Addendum 2

Job Walk 1

Job Walk 2

Bid Result

 

 

 

 3/15/2012

 4/10/2012

 ADA Site Improvements of Play Yard & Restroom Renovation @ Frank McCoppin ES   

 

 

 

 03/09/2012 

 04/03/2012 

 Food & Food Supplies - Student Nutrition

Question & Answer

 

 

 

 03/09/2012

 04/02/2012

 04/12/2012

 Fairmount ES & Grattan ES Greening

Sign-In Sheet

Sign In Sheet 2

Bid  Opening Postponed to April 5, 2012 at 2:00 p.m. (pls see attached email)

Bid Result

 

 

 

 3/6/2012

 3/29/2012

 Rebid - ADA Site Improvements for Student Nutrition Services Facility 

 

 

 

 03/01/2012 

 03/27/2012 

 Bid Results 

 

 

 

 03/29/2012 

 03/27/2012 

 Claire Lilientahl ES John Muir ES Greening

    Sign In Sheet

Sign-In Sheet 2

Labor Compliance Program

Bid Result

 

 

 

 03/1/2012

 4/04/2012

 Dr. William Cobb ES Greening

Sign-In Sheet

Sign-In Sheet 2

Bid Result

Designated Subcontractors List

 

 

 

 3/01/2012

 03/28/2012

 Alamo ES & Alice Fong Yu AS Greening

Sign-In Sheet

Sign In Sheet 2

Labor Compliance Program

Bid Result

 

 

 

 03/1/2012

 03/27/2012

 Longfellow Building Maintenance & Seismic Strengthening 

 

 

 

 02/28/2012 

 03/21/2012 

 Bid Walk Agenda 

 

 

 

 03/01/2012 

 03/01/2012 

 Bid Walk No. 1 

 

 

 

 03/02/2012 

 03/01/2012 

 Bid Results 

 

 

 

 03/21/2012 

 03/21/2012 

 Play Yard Alterations @ Argonne Child Development Center 

 

 

 

 02/22/2012 

 03/22/2012 

 Bid Results 

 

 

 

 03/29/2012 

 03/22/2012 

 SFUSD Facilities Design & Construction :  SOQ for Architectural Services 

 

 

 

 02/21/2012 

 03/20/2012 

 Window Replacement at McKinley ES

 

 

 

 02/07/2012

 02/28/2012

 Bid Results 

 

 

 

 03/29/2012 

 02/28/2012 

 Pre-Bid Conference  Attendees 

 

 

 

 02/10/2012 

 02/09/2012 

 Addendum No. 1 

 

 

 

 02/22/2012 

 02/28/2012 

 Addendum No. 2 

 

 

 

 02/22/2012 

 02/28/2012 

 Bid Results 

 

 

 

 03/6/2012 

 02/28/2012 

 Voluntary Partial Seismic Strengthening at Daniel Webster ES

 

 

 

 02/07/2012

 03/07/2012

 Bid Walk February 15, 2012 

 

 

 

 02/16/2012 

 03/07/2012 

 Job Walk Agenda February 15, 2012 

 

 

 

 02/16/2012 

 03/07/2012 

 Bid Results 

 

 

 

 03/08/2012 

 03/07/2012 

Window Replacement at McKinley ES 

 

 

 

 01/26/2012 

 02/28/2012 

 Bid Results 

 

 

 

 03/29/2012 

 02/28/2012 

 Chiller Replacement at 555 Franklin St. Administrative Officers , SF CA 94102

 

 

 

 01/10/2012

02/09/2012

 Bid Results   

 

 

 

 02/09/2012 

02/09/2012 

 ADA Site Improvements for Student Nutrition Services Facility 

 

 

 

 01/04/2012 

02/07/2012 

 Job Walk 

 

 

 

 01/18/2012 

01/17/2012 

 Gateway/Kipp Charter Schools Window Replacement

Job Walk 1

Job Walk 2

Bid result

Subcontractors List

 

 

 

12/13/2011

12/21/2011

1/10/12

Replacement of Entrance Doors at James Denman M.S.

 

 

 11/22/2011 12/20/2011

 Bid Results 

 

 

 01/31/2012  12/20/2011 

Francis Scott Key ES Permanent Modular Classrooms

Sign in sheet

Sign in sheet 2

Bid Result

Subcontractors List

 

 

 10/28/201111/29/2011

 

10/28/2011

11/22/2011

CISCO NETWORK HARDWARE 2011

 

 

 

10/27/2011

  • 11/02/2011
  • 11/03/2011
  • 11/08/2011
  • 11/03/2011
  • 11/08/2011
  • 11/10/2011
  • 11/30/2011

11/17/2011

Roofing Repair at SFUSD Buildings & Grounds

Pre-Bid Conference Attendees

Bid Walk Agenda & LCP

Bid Results 10/05/2011

 

 

 

09/21/2011

10/05/2011

Repair & Maintenance of Kitchen Equipment

Intent to Award (11/17/2011)

 

 

 

 

9/20/2011

10/27/2011

Modular Building Installation and other Site Improvements at Horace Mann MS and Bryant ES

-Pre-Bid Conference Attendees List

-Bid Results - 05/27/2011

 

 

 

05/25/2011

05/27/2011

School Yard Pavement Resurfacing at Various Sites

-Bid Results - 6/14/2011

 

 

05/23/2011

06/14/2011

Guadalupe ES Modernization

Addendum on change of Bid Date to June 16,2011

Job Walk 1

Job Walk 2

Bid Result

Subcontractors List

 

 

5/16/2011

6/16/2011

Bottled Water And Dispenser

 

 

5/16/2011

6/7/2011

Xerographic Paper Bid

 

 

5/16/2011

6/7/2011

Reroofing Project at Student Nutrition & June Jordan School of Equity

-Bid Results 5/10/2011

 

 

4./26/2011

5/10/2011

Abraham Lincoln HS Fire Sprinkler Modification

Job Walk 1

Job Walk 2

Bid Result

 

 

5/11/2011

6/02/2011

Junipero Serra EMS Replacement

-Bid Walk Agenda 5.10.2011

-Bid Walk Sign-In Sheet 5.10.2011

-Bid Result 5.27.2011

 

 

4/29/2011

5/27/2011

Therapy Bus Transportation Service

 

 

4/29/2011

 

 

 

 

6/1/2011

Civic Center Secondary School At John Swett Campus Modernization

Job Walk 1

Job Walk 2

Result

Subcontractors List

 

 

4/21/2011

5/24/2011

555 Franklin St. Cooling Tower and Sump Pump Replacement

 

 

 

 

George Washington, West Portal ES, Rosa Park Structural Upgrade

Job Walk

Job Walk 2

Addendum 2 Package 2

Bid Result

Subcontractors List

 

 

04/14/2011

04/28/2011

Flooring Project -- Package 1 : Garfield, Ida B. Wells, and Sunnyside

- Bid Results 05/04/2011

 

 

04/05/2011

05/04/2011

 Argonne ES, El Dorado ES, Independence HS Ext. Ptg. Revised

- Bid Results 4/21/2011

 

 

 

03/29/2011

04/21/2011

Dr. Charles Drew ES Structural Upgrade

Job Walk

Result

Subcontractors List

 

 

03/28/2011

04/14/2011

Leonard R. Flynn ES Painting and Resurfacing Play Yards

 

 

03/29/2011

04/05/2011

Hilltop HS Modernization

 

 

 

03/08/2011

04/07/2011

Balboa HS, James Denman MS, Thurgood Marshall Greening Project

 

 

 

03/01/2011

04/06/2011

Civic Center Secondary School Demolition and Abatement Project

 

 

 

03/22/201104/05/2011

AP Giannini MS, Lincoln HS and Lowell HS Greening

 

 

 

02/25/2011

04/05/2011

Painting & Resurfacing Play Yards @ L.R. Flynn ES

 

 

 

03/04/2011

04/05/2011


Recent Invitations for Bids