Skip Navigation  

Current Invitations for Bids

Invitation for Bids

Date Posted

Open Date

Children Administration Center - First Floor Window Replacement

10/21/2014 11/20/2014

MOVING & STORAGE SERVICES BID

10/15/2014 11/12/2014

James Lick Middle School Modernization

09/30/2014 10/28/2014

James Lick Middle School Interim Housing

09/16/2014 10/14/2014

Replacement of Corridor Lockers at James Denman MS, Phase 2

 

09/10/2014  09/18/2014 

10/01/2014 

Wells High School Make-Ready -O'Connell HS

09/04/2014 09/30/2014

Lowell HS Computer Lab Renovation

 

06/30/2014  07/11/2014 

07/28/2014 

State A.B.211 Door Lockset Replacement at Various Sites - Bid Package 4

05/20/2014 06/06/2014

Balboa High School:  Tennis Court Repairs 

05/05/2014  05/28/2014 

Ruckus Network Hardware

04/29/2014 05/13/2014

RE-BID Replacement of Lockers at Marina MS

04/28/2014 05/15/2014

New Academic Campus - New Classroom Addition

04/28/2014 05/27/2014

Meal Delivery Services 2014

04/24/2014 05/16/2014

IT Phones Upgrades

04/21/2014 05/20/2014

Spring Valley ES Fencing Replacement

04/18/2014 05/22/2014

Xerographic Paper Bid 2014

04/15/2014 04/29/2014

Sherman ES & Yoey Campus -- Paving Repairs & Site Improvements of School Yards 

04/10/2014  04/30/2014 

Locksmith Hardwares 2014 Bid

04/01/2014 04/15/2014

SF Community School ADA Site Improvements of Play Yard 

03/31/2014  04/22/2014 

McAteer Campus, Miscellaneous Projects

03/31/2014 04/22/2014

Replacement of Lockers at Marina  Middle School 

03/27/2014  04/21/2014 

Chinese Education Center ES -- Security Improvements Project 

03/14/2014  04/16/2014 

New Academic Campus - Kitchen Building Alteration

03/17/2014 04/15/2014

Water Bottle Filling Station Installation at Multiple School Sites 

03/12/2014  04/11/2014 

Jose Ortega ES Modernization

03/17/2014 04/08/2014

Cesar Chavez ES Security Surveillance System

03/17/2014 04/08/2014
Hillcrest ES -- Yard Paving Project
  • 03/04/2014 
04/08/2014 

Reroofing Project @ James Denman MS 

  • 03/03/2014 
04/02/2014 

Bret Harte ES Exterior & ADA Improvements Project 

02/25/2014  03/25/2014 

Cisco Hardware 2014 Bid

02/25/2014 03/11/2014

Gordon J. Lau ES Modernization, with Commodore Stockton EES Modernization

02/24/2014 03/25/2014

Alteration of Classroom D & to Add a New Accessible Restroom at Lawton Alternative School 

  •  2/19/2014 
  • 02/27/2014 
  • 03/19/2014 
03/18/2014 

Miraloma Elementary School Modernization

02/18/2014 03/18/2014
Claire Lilienthal ES (Madison & Scott Campuses) Playground Safety Surfacing
   
 02/14/2014 
 03/12/2014 
Elevator Enclosure Repair @ West Portal Elementary School

 

01/31/2014 02/14/2014 

  • 03/05/2014 

 

02/26/2014 

Roosevelt Middle School Modernization

01/28/2014 02/25/2014

Lowell HS Units 4 & 5, Voluntary Seismic Strengthening

01/21/2014 02/18/2014

New Traditions ES & A.P. Giannini MS  Fence Replacement 

1/17/2014

 

02/5/2014

02/26/2014 

2/20/2014

Burton High School  Modernization

01/09/2014 02/11/2014

Presidio MS Boiler Replacement - Cancelled

01/06/2014 02/06/2014

Sunnyside Elementary School Bungalow Replacement and Modernization

01/03/2014

02/04/2014

Starr King Elementary School

12/30/2013 01/30/2014

Re-bid of Phase 2 Modernization at Monroe Elementary School

12/13/2013 01/21/2014

Las Americas Early Education School ADA Site Improvements of Play Yard 

12/12/2013 

12/12/2013

11/26/2013 

601 McAllister Flooring Replacement & Painting Project 

  • 12/10/2013

      12/20/2013

  • 01/09/2014
01/08/2014 

Removal of Existing Flooring & Installation of New Linoleum Flooring @ Everett MS 

12/09/2013 

   12/20/2013

  01/08/2014

01/08/2014 

Dairy Bid D-010114

11/26/13 12/20/13

Relocation of the Special Education Program at 3045 Santiago Streeet 

 

11/6/13

 

11/19/2013 
RUCKUS NETWORK HARDWARE BID

11/21/2013

12/05/2013

Door Lockset Replacement-Package 3 (11630)

10/21/2013 

11/1/13 

11/18/13 

11/15/2013 

ADA Site Improvements of Play Yard at Visitacion Valley ES

 

  • 10/04/13
  • 10/04/13
  • 10/17/13
  • 10/22/13
  • 10/18/13
  • 10/30/13 

10/29/2013

Nourse Auditorium Toilet Room Renovation

 

  • 10/04/13
  • 10/18/13
  • 10/18/13
  • 10/24/13
  • 11/15/13
  • 11/25/13 
 11/22/2013

Monroe Elementary School Modernization

09/16/2013 10/15/2013

New Academic Campus Modernization

09/09/2013 10/01/2013

CLASSROOM FURNITURE - ALAMO ES

08/12/2013 08/27/2013

George Peabody Elementary School Modernization

07/08/2013 08/13/2013

 Paint and Painting Supplies

07/02/2013

07/23/2013
SFUSD SOQ Civil Structural Services  07/02/2013  07/26/2013 
Request for SOQ Notice for Engineering Services  06/14/2013  07/12/2013 
The Expansion of the Early Education School Program at Leola Havard School 05/17/2013  06/11/2013
05/31/2013   
06/12/2013   
Claire Lilienthal ES Exterior Wall & Expansion Joint Repairs 05/15/2013  06/05/2013
05/24/2013   
05/31/2013   
05/31/2013   
05/31/2013   
06/10/2013   

LIGHTSPEED ROCKET SYSTEM

05/13/2013 05/28/2013
STATE AB211 Door Lockset Replacement at Various Sites (BID PACKAGE 1)    05/07/2013  05/28/2013 
 05/21/2013 
 
State AB211 Door Lockset Replacement  at Various Sites (BID PACKAGE 2) 
 
 05/06/2013 
 05/29/2013 
 05/21/2013 
 
Reroofing Project @ Irving M.  Scott Building 04/26/2013  05/22/2013 
    Pre-Bid Conference Attendees  05/08/2013   
    Bid Results  05/23/2013   

SECURITY SERVICES

04/25/2013 05/30/2013

MEAL DELIVERY SERVICES

04/23/2013 05/28/2013

2340 Jackson Street - 4th Floor Library Voluntary Seismic Upgrade

04/23/2013 05/15/2013
S. F. Community School Exterior Building Envelope Repairs  04/22/2013  05/14/2013 
Pre-Bid Conference Attendees  04/30/2013   
  Addenum No. 1  05/09/2013   
  Bid Results  05/16/2013   

Yick Wo Elementary School Modernization

04/23/2013 05/21/2013
Tennis Court Improvements at Lowell HS  04/22/2013  05/15/2013 
   Pre-Bid Conference Attendees  05/01/2013   
   Bid Results  05/16/2013   

Cesar Chavez Elementary School Modernization

04/08/2013 05/15/2013

Rebid - Dr. GW Carver ES and Sutro ES Greening

Job Walk

Bid Result

Subcontractors List

04/08/2013 05/01/2013
REVISED Chinese Education Center /  Bid Results     
(Replacement of Play Yard Surfacing)  04/03/2013  04/03/2013 

 Cisco Network Hardware IFB 2013

04/02/2013 04/12/2013
Marina MS Gym Floor Repair & Refinish Project  04/02/2013  04/30/2013 
       REVISED  Marina MS Gym Floor Repair & Refinish Project 
04/04/2013  04/30/2013 
    Pre-Bid Attendees  04/18/2013   
    Bid Walk Agenda  04/18/2013   
    Addendum No. 1  04/18/2013   
    Bid  Results  04/30/2013   
Replacement of Play Yard Surfacing Chinese Education Center  / Bid Results  03/07/2013  03/07/2013 

Ruckus Network Hardware IFB Invitation

03/26/2013 04/05/2013

Alamo ES Shade Replacement

Addendum 1

Job Walk

Bid Result

Subcontractors List

03/22/2013 04/30/2013
Water Bottle Filling Station Installation at Various School Sites  03/19/2013  04/25/2013 
 Bid Walk Sign In Sheet  04/03/2013   
Job Walk Agenda  04/03/2013   
Addendum No. 1  04/15/2013 
 
 Bid Results  04/26/2013   

Martin Luther King Middle School and Glen Park Elementary School Boiler Replacement

Job Walks

Bid Result

Subcontractors List

03/27/2013 04/25/2013

Re-Bid Glen Park ES and Guadalupe ES Greening

Job Walk

Bid Result

03/26/2013 04/24/2013

Chinese Immersion at William DeAvila Boiler Replacement

Job Walk

Bid Result

03/27/2013 04/23/2013
Interior Improvement at Bret Harte ES  03/18/2013  04/05/2013 
Pre-Bid Conference Attendees  03/22/2013  03/21/2013 
Bid Results  04/05/2013  04/05/2013 
Addendum No. 1  04/02/2013  04/05/2013 
Addendum No. 2  04/02/2013  04/05/2013 
Reroofing Project @ James Denman MS  03/18/2013  04/09/2013 
Pre-Bid Conference Attendees  03/26/2013  03/26/2013 
Bid Results  04/11/2013  04/09/2013 
Playground Safety Surfacing @ Daniel Webster ES  03/18/2013  04/09/2013 

Lawton Alternative School Greening Project

Job Walk 1

Job Walk 2

Bid Result

03/13/2013 04/24/2013

Chinese Education Center Greening Project

Job Walk 1

Bid Result

03/13/2013 04/24/2013

Bret Harte Early Education School Modernization

Job Walk 1

Job Walk 2

Bid Result

Subcontractor List

03/21/2013 04/23/2013

McAteer Campus - Boiler Replacement

Job Walk

Bid Result

Subcontractor List

03/13/2013 04/09/2013

Second Floor Window Replacement At Children Administration Center

Addendum number 1

Addendum number 2

Bid Result

Subcontractor List

3/11/2013 4/4/2013
Pre-Bid Conference Attendees  03/21/2013  04/04/2013 
Replacement of Play Yard Surfacing for Chinese Education Center - Rebid 03/11/2013 04/03/2013
  Bid Results   04/03/2013 
 04/03/2013 

Increment 2 at Burnett CDC

Job Walk 1

Job Walk 2

Addendum no 1

Bid Results

03/06/2013 04/02/2013

Bid Result - Increment 2 at  Burnett CDC

Subcontractors List

   
Modernization & Interior Improvement Project @ ER Taylor Elementary School  03/06/2013  04/03/2013 
Pre-Bid Conference Attendees  03/20/2013  03/19/2013 
Addendum No. 1  03/25/2013  04/17/2013 
Addendum No. 2  04/09/2013  04/23/2013 
Addendum No. 3  04/17/2013   
Bid Results  04/24/2013   
ADA Site Improvements of Play Yard @ George W. Carver Elementary School  03/01/2013  03/27/2013 
  Bid Opening Tabulation  
03/27/2013   03/27/2013   

Lowell High School Unit 1, 2, & 3 Voluntary Seismic Strengthening

Job Walk 1

Job Walk 2

Bid Results

Subcontractors List

02/21/2013 03/21/2013
Replacement of Cafeteria Windows & Light Fixtures @ James Denman Middle School  02/15/2013  03/13/2013 
Bid Results  03/18/2013  03/13/2013 

GW Carver ES and Sutro ES Greening Project

EPA Fact Sheet

EPA Firm Application

Job Walk 1

Job Walk 2

02/13/2013 04/03/2013

Chinese Immersion and Francis Scott Key ES Greening

EPA Lead-Safe Info Sheet

EPA Application and Instructions for Firms

Job Walk 1

Job Walk 2

Bid Result

Subcontractor List

02/13/2013 04/03/2013
Thurgood Marshall High School Structural Upgrades  02/12/2013  03/13/2013 
Job Walk Agenda  02/27/2013  02/26/2013 
Bid Walk Attendees  02/27/2013  02/26/2013 
Bid Results  03/18/2013  03/13/2013 
101Ruth Asawa-School of the Arts Track Improvements  02/12/2013  03/19/2013 
Bid Walk Agenda  03/01/2013  02/28/2013 
Sign In Sheet  03/01/2013  02/28/2013 
Bid Results  03/19/2013  03/19/2013 

Cleveland ES and Spring Valley ES Greening Project

Pre-construction Job Walk Agenda

Job Walk 1

Job Walk 2

Bid Result

02/06/2013 03/20/2013

Glen Park ES and Guadalupe ES Greening Project

Job Walk Agenda

Job Walk 1

Job Walk 2

02/06/2013 03/20/2013
Commodore Sloat Auditiorium Flooring 02/05/2013 03/05/2013
Job Walk Agenda  02/14/2013  02/14/2013 
Bid Walk Attendees  02/14/2013  02/14/2013 
Bid Results  03/05/2013  03/05/2013 
Wellness Center Project @ Lowell High School 01/14/2013 02/06/2013
Bid Results  02/08/2013  02/06/2013 
Emergency Power System @ John O'Connell HS (REBID) 11/06/2012 11/28/2012
Pre-Bid Conference Attendees 11/15/2012 11/14/2012
Bid Results 11/28/2012 11/28/2012

New Academic Campus @ 300 Seneca--Demolition Package

Job Walk 1

Job Walk 2

Addendum 1

Bid Result

Subcontractors List

10/29/2012 11/21/2012

Jose Ortega Elementary School-Security Camera Project

Job Walk 1

Job Walk 2

Bid Result

Subcontractors List

10/24/2012 11/21/2012

Sarah B. Cooper - Various Improvements

Job Walk 1

Job Walk 2

Addendum 1

Bid Result

Subcontractors List

10/24/2012 11/20/2012
New Willie L. Brown MS Pre-Qualified Design Builders 10/22/2012  

Monroe ES New Modular Two-Story Building

Job Walk 1

Job Walk 2

Bid Result

Subcontractors List

10/09/2012 10/30/2012

Student Nutrition Meal Services IFB

Bid Documents

Questions & Answers

Questions & Answers - Part No. 2

IFB MS-2012 Bid Addendum No. 1

IFB MS-2012 Bid Addendum No. 2

IFB MS-2012 21 Days Menu Cycles

IFB MS-25012 Revised Bid Sheets

Intent To Award Notice

10/09/2012

 

10/26/2012

11/02/2012

11/02/2012

11/02/2012

11/02/2012

11/02/2012

11/30/2012

11/13/2012

Emergency Power System @ John O'Connell HS

09/27/2012

10/10/2012

Pre-Bid Conference Attendees

09/27/2012

09/26/2012

Bid Results

10/15/2012

10/10/2012

ADA Site Improvements of Play Yard @ Lafayette ES

9/11/2012

10/03/2012

Pre Bid Conference Attendees

9/21/2012

9/19/2012
Bid Results 10/9/2012 10/3/2012

Reroofing Project of Nourse Adutiorium

8/16/2012

9/12/2012

Pre-Bid Conference Attendees

08/30/2012

08/29/2012

Bid Results

09/13/2012

09/12/2012

Ulloa ES Bungalow Replacement

Addendum No. 1

Job Walk 1 - 08 09 2012

Job Walk 2 - 08 16 2012

Addendum No. 2

Addendum No, 3

Addendum No, 4

BID DATE CHANGED TO: 8/28/2012

Bid Result

Subcontractors List

7/16/2012

8/28/2012

Reprographic Services RFP 2012

Addendum

Intent to Award Notice

07/10/2012

08/16/2012

09/26/2012

08/21/2012

Food and Food Supplies

7/10/2012

8/7/2012

Boiler Replacement @ Dr. Charles Drew College Prep Academy / BID RESULTS

06/21/2012

06/08/2012

New Computer Labs @ Various Sites/Bid Results

06/14/2012

06/08/2012

Student Nutrition Services - Boiler Replacement

 

 

Bid Results

6/8/2012

6/7/2012

Pavement Resurfacing & Repairs @ CDA/Marina Middle School

5/30/2012

5/24/2012

Bid Results

5/30/2012

5/24/2012

Virco Classroom Furniture Bid

Addendum No. 1

Question & Answer (Q&A)

Intent to Award

Bid Results

05/22/2012

05/24/2012

05/31/2012

06/12/2012

07/03/2012

06/06/2012

Cisco Hardware Bid 2012

Addendum No.1

Intent to Award

Bid Results

05/22/2012

05/23/2012

06/11/2012

07/03/2012

06/05/2012

Roosevelt MS Abatement Project

Addendum No. 1

Addendum No. 2

Sign In Sheet Preconstruction Meeting No. 1

Sign In Sheet Preconstruction Meeting No. 2

Bid Result

Sub Contractors List

05/17/2012 06/12/2012

Willie Brown Jr. MS Demolition Project

Job Walk Sign In Sheet

Job Walk Sign In Sheet 2

Bid Result

Subcontractors List

5/11/2012

6/5/2012

Sitework for Placement of New Relocatable Classroom Buildings @ Sunnyside ES

05/09/2012

05/23/2012

Pre-Bid Conference Attendees

05/09/2012

05/23/2012

Bid Results

05/24/2012

05/23/2012

Cleveland and Lakeshore Alternative Elementary School Boiler Replacement

Job Walk Sign-In Sheet May 16, 2012

Bid Result

5/7/2011

5/30/2012

Water Bottle Filling Station Installation at Six Sites

4/30/2012

05/30/2012

Addendum No. 1

05/232012

05/16/2012

Addendum No. 2

05/23/2012

05/23/2012

Bid Results

06/18/2012

06/08/2012

Re-bid of ADA Site Improvements of Play Yard & Restroom Renovation @ Frank McCoppin ES

04/26/2012

05/17/2012

Pre-Bid Conference Attendees

05/03/2012

05/17/2012

Emergency Showers @ Science Classrooms at Lowell High School

04/23/2012

05/02/2012

Pre-Bid Conference Attendees

04/23/2012

04/20/2012

Bid Results

05/04/2012

05/02/2012

Repair of Exterior Walls @ Independence High School

04/20/2012

05/01/2012

Pre-Bid Conference Attendees

04/20/2012

04/18/2012

Bid Results

05/01/2012

05/01/2012

JANITORIAL PAPER & SUPPLIES BID

Bid Documents

04/18/2012

05/03/2012

Lowell HS- Exterior Painting Project

Job Walk 1

Bid Result

Subcontractors List

Work Preservation Letter

4/5/2012

4/26/2012

Buena Vista CDC/Horace Mann MS Renovations for ES Expansion

04/02/2012

04/24/2012

Pre-B id Conference Attendees

04/10/2012

04/10/2012

Bid Results

04/26/2012

04/24/2012

Bid Results (UPDATED)

05/01/2012

04/24/2012

Argonne ES ADA Site Improvements of Play Yard

03/29/2012

04/25/2012

Pre-Bid Conference Attendees

04/11/2012

04/11/2012

SFUSD Flooring Projects at Three Sites

03/29/2012

05/08/2012

Bid Walk Agenda

04/24/2012

04/19/2012

 RUCKUS NETWORK HARDWARE

 

 

Bid Walk

04/24/2012

04/19/2012

Abraham Lincoln HS Increment 3 Project

Job Walk Sign In Sheet 1

Job Walk Sign In Sheet 2

Bid Result

Subcontractors List

 

3/28/2012

4/24/2012

SOTA Security Camera System Installation

03/27/2012

05/04/2012

Job Walk Agenda

04/12/2012

04/12/2012

Sutro ES Exterior & Interior Painting & Flooring Project

03/27/2012

04/18/2012

Job Walk #1

04/11/2012

04/18/2012

Job Walk #2

04/11/2012

04/18/2012

Bid Results

04/19/2012

04/18/2012

Renovations for SFIHS Expansion

03/20/2012

04/19/2012

Pre-Bid Conference Attendees

04/09/2012

04/19/2012

Bid Results

04/20/2012

04/19/2012

Martin Luther King MS Shade Replacement Project

Job Walk 1

3/15/2012

4/10/2012

Luther Burbank/ June Jorden School for Equity Digital Security Project

Addendum 1

Addendum 2

Job Walk 1

Job Walk 2

Bid Result

3/15/2012

4/10/2012

ADA Site Improvements of Play Yard & Restroom Renovation @ Frank McCoppin ES

03/09/2012

04/03/2012

Food & Food Supplies - Student Nutrition

Question & Answer

03/09/2012

04/02/2012

04/12/2012

Fairmount ES & Grattan ES Greening

Sign-In Sheet

Sign In Sheet 2

Bid Opening Postponed to April 5, 2012 at 2:00 p.m. (pls see attached email)

Bid Result

3/6/2012

3/29/2012

Rebid - ADA Site Improvements for Student Nutrition Services Facility

03/01/2012

03/27/2012

Bid Results

03/29/2012

03/27/2012

Claire Lilientahl ES John Muir ES Greening

Sign In Sheet

Sign-In Sheet 2

Labor Compliance Program

Bid Result

03/1/2012

4/04/2012

Dr. William Cobb ES Greening

Sign-In Sheet

Sign-In Sheet 2

Bid Result

Designated Subcontractors List

3/01/2012

03/28/2012

Alamo ES & Alice Fong Yu AS Greening

Sign-In Sheet

Sign In Sheet 2

Labor Compliance Program

Bid Result

03/1/2012

03/27/2012

Longfellow Building Maintenance & Seismic Strengthening

02/28/2012

03/21/2012

Bid Walk Agenda

03/01/2012

03/01/2012

Bid Walk No. 1

03/02/2012

03/01/2012

Bid Results

03/21/2012

03/21/2012

Play Yard Alterations @ Argonne Child Development Center

02/22/2012

03/22/2012

Bid Results

03/29/2012

03/22/2012

SFUSD Facilities Design & Construction : SOQ for Architectural Services

02/21/2012

03/20/2012

Window Replacement at McKinley ES

02/07/2012

02/28/2012

Bid Results

03/29/2012

02/28/2012

Pre-Bid Conference Attendees

02/10/2012

02/09/2012

Addendum No. 1

02/22/2012

02/28/2012

Addendum No. 2

02/22/2012

02/28/2012

Bid Results

03/6/2012

02/28/2012

Voluntary Partial Seismic Strengthening at Daniel Webster ES

02/07/2012

03/07/2012

Bid Walk February 15, 2012

02/16/2012

03/07/2012

Job Walk Agenda February 15, 2012

02/16/2012

03/07/2012

Bid Results

03/08/2012

03/07/2012

Window Replacement at McKinley ES

01/26/2012

02/28/2012

Bid Results

03/29/2012

02/28/2012

Chiller Replacement at 555 Franklin St. Administrative Officers , SF CA 94102

01/10/2012

02/09/2012

Bid Results

02/09/2012

02/09/2012

ADA Site Improvements for Student Nutrition Services Facility

01/04/2012

02/07/2012

Job Walk

01/18/2012

01/17/2012

Gateway/Kipp Charter Schools Window Replacement

Job Walk 1

Job Walk 2

Bid result

Subcontractors List

12/13/2011

12/21/2011

1/10/12

Replacement of Entrance Doors at James Denman M.S.

11/22/2011 12/20/2011

Bid Results

01/31/2012 12/20/2011

Francis Scott Key ES Permanent Modular Classrooms

Sign in sheet

Sign in sheet 2

Bid Result

Subcontractors List

10/28/2011 11/29/2011
ADA Site Improvements for Student Nutrition Services Facility

10/28/2011

11/22/2011

CISCO NETWORK HARDWARE 2011

10/27/2011

  • 11/02/2011
  • 11/03/2011
  • 11/08/2011
  • 11/03/2011
  • 11/08/2011
  • 11/10/2011
  • 11/30/2011

11/17/2011

Roofing Repair at SFUSD Buildings & Grounds

Pre-Bid Conference Attendees

Bid Walk Agenda & LCP

Bid Results 10/05/2011

09/21/2011

10/05/2011

Repair & Maintenance of Kitchen Equipment

Intent to Award (11/17/2011)

9/20/2011

10/27/2011

Modular Building Installation and other Site Improvements at Horace Mann MS and Bryant ES

-Pre-Bid Conference Attendees List

-Bid Results - 05/27/2011

05/25/2011

05/27/2011

School Yard Pavement Resurfacing at Various Sites

-Bid Results - 6/14/2011

05/23/2011

06/14/2011

Guadalupe ES Modernization

Addendum on change of Bid Date to June 16,2011

Job Walk 1

Job Walk 2

Bid Result

Subcontractors List

5/16/2011

6/16/2011

Bottled Water And Dispenser

5/16/2011

6/7/2011

Xerographic Paper Bid

5/16/2011

6/7/2011

Reroofing Project at Student Nutrition & June Jordan School of Equity

-Bid Results 5/10/2011

4./26/2011

5/10/2011

Abraham Lincoln HS Fire Sprinkler Modification

Job Walk 1

Job Walk 2

Bid Result

5/11/2011

6/02/2011

Junipero Serra EMS Replacement

-Bid Walk Agenda 5.10.2011

-Bid Walk Sign-In Sheet 5.10.2011

-Bid Result 5.27.2011

4/29/2011

5/27/2011

Therapy Bus Transportation Service

4/29/2011

6/1/2011

Civic Center Secondary School At John Swett Campus Modernization

Job Walk 1

Job Walk 2

Result

Subcontractors List

4/21/2011

5/24/2011

555 Franklin St. Cooling Tower and Sump Pump Replacement

   

George Washington, West Portal ES, Rosa Park Structural Upgrade

Job Walk

Job Walk 2

Addendum 2 Package 2

Bid Result

Subcontractors List

04/14/2011

04/28/2011

Flooring Project -- Package 1 : Garfield, Ida B. Wells, and Sunnyside

- Bid Results 05/04/2011

04/05/2011

05/04/2011

 Argonne ES, El Dorado ES, Independence HS Ext. Ptg. Revised

- Bid Results 4/21/2011

03/29/2011

04/21/2011

Dr. Charles Drew ES Structural Upgrade

Job Walk

Result

Subcontractors List

03/28/2011

04/14/2011

Leonard R. Flynn ES Painting and Resurfacing Play Yards

03/29/2011

04/05/2011

Hilltop HS Modernization

03/08/2011

04/07/2011

Balboa HS, James Denman MS, Thurgood Marshall Greening Project

03/01/2011

04/06/2011

Civic Center Secondary School Demolition and Abatement Project

03/22/2011 04/05/2011

AP Giannini MS, Lincoln HS and Lowell HS Greening

02/25/2011

04/05/2011

Painting & Resurfacing Play Yards @ L.R. Flynn ES

03/04/2011

04/05/2011