APG Modernization Plan
- MODERNIZATION PLAN (click on link for design team's presentation)
- Update all classrooms and library
- Completely modernize science classrooms
- Refresh art classroom
- Enlarge drama classrooms and refresh interior
- Modernize music classrooms and refresh storage area
- Renovate auditorium: fix broken seats; replace sound system, projector, and screen; refinish stage floor; replace stage curtains and rerope stage equipment; fix stage lighting, add lighting at sides; paint walls
- Renovate gym & locker rooms*: refinish gym floor, replace bleachers, replace basketball backboards; apply glare-reducing film to windows; refresh ceilings and walk-off mats; update locker room paint, flooring, and walls; replace lockers; replace locker room shower areas with office, storage, and 100 additional lockers
- Modernize kitchen and cafeteria
- Add new staff lounge
- Campus-wide updates:
- Refresh restrooms
- Replace lighting with LED fixtures
- Upgrade campus security systems
- Upgrade campus data systems
- Install new window shades
- Fix interior leaks
- Paint interior spaces
- Relocate main office to Ortega ramp area; create new front entry visible from street; increase security by replacing door hardware
- Structural strengthening; replace roof; paint exterior; add code-compliant insulation; construct new trash enclosure
This page was last updated on March 10, 2020