CUPCCAA Informal Invitations for Bids Link to this section
CUPCCAA Informal Bids | Date Posted | Due Date |
|---|---|---|
Rosa Parks Elementary School- Destructive Testing SFUSD Project No. 12504 Date posted: 06/11/2026
| 06/11/2026 | 06/18/2026 before 4:00 p.m. |
Denman Middle School Modernization, Package 2 - Destructive Testing, SFUSD Project No. 12346 Date posted: 06/09/2026
| 06/09/2026 | 06/23/2026 Before 1:00 p.m. |
ER Taylor Elementary School - Destructive Testing, SFUSD Project No. 12506 Date posted: 06/01/2026
| ||
Edwin and Anita Lee Newcomer School - Building Renovations for Special Day Class (SDC), SFUSD Project No. 12569 Date posted: 05/04/2026
| ||
Claire Lilienthal Alternative Elementary School (Madison) - Play Yard Improvements, SFUSD Project No. 12573 Date posted: 04/27/2026
| ||
Monroe Elementary School Balcony Repair and Yard Improvement, SFUSD Project No. 12565 Date posted: 04/03/2026
| ||
Clarendon Alternative Elementary School Courtyard Replacement, SFUSD Project No. 12540 Date posted: 04/03/2026
| ||
Rebid - John Muir Elementary School Restroom Alterations - Project No. 12534 Date posted: 03/27/2026
| ||
Sanchez Elementary School - Kiln Room - Project No. 12293 Date posted: 04/06/2026
| ||
Longfellow Elementary School Restroom and Play Yard Renovation for Transitional Kindergarten - Project No. 12470 Date posted: 03/17/2026
| ||
John Muir Elementary School Restroom Alterations- Project No. 12534 Date posted: 03/06/2026
| ||
Cafeteria Painting - 8 Schools - Project No. 12526 Date posted: 02/24/2026
| ||
Rebid-Commodore Sloat Elementary School Accessible Site Improvements, SFUSD Project No. 12471 Date posted: 02/05/2026
| ||
Commodore Sloat Elementary School Accessible Site Improvements, SFUSD Project No. 12471 Date posted: 01/20/2026
| ||
A.P. Giannini Middle School PA Speaker Upgrade - Project No. 12479 Date posted: 09/17/2025
| ||
Rebid-Rooftop Elementary School, Data Repair Project - Project No. 12445 Date posted: 03/20/2025
| ||
Rooftop Elementary School, Data Repair Project - Project No. 12445 Date posted: 02/21/2025
| ||
Paul Revere Elementary School Main Building and Paul Revere Elementary School Annex, Boiler Replacement - Project No. 12461 Date posted: 01/30/2025
| ||
Jefferson Early Education School, Roof Replacement - Project No. 12441 Date posted: 01/22/2025
| ||
Leola Havard Early Education School, Fan Coil Heating Units Installation - Project No. 12401 Date posted: 01/06/2025
| ||
Ida B. Wells High School, Removal of Tiled Wall Mural - Project No. 12436 Date posted: 10/04/2024
| ||
Buena Vista Horace Mann K-8 Footing Repair - Project No. 11959 Date posted: 09/10/2024
| ||
Alamo Elementary School, Removal of Two (2) Portable Buildings - Project No. 12403 Date posted: 06/04/2024
| ||
Sanchez Elementary School, UPS for VOIP - Project No. 11542 Date posted: 06/04/2024
| ||
Sunset Elementary School, UPS for VOIP - Project No. 11542 Date posted: 06/04/2024
| ||
Bessie Carmichael Elementary School, UPS for VOIP - Project No. 11542 Date posted: 05/21/2024 | ||
Galileo HS, Balboa HS, George Moscone ES, Mission Education Center ES, Remote Door Access System Upgrades - Package 5, Project No. 11970 Date posted: 05/10/2024
| ||
New Traditions Creative Arts Elementary School - Play Yard Wooden Fence Replacement, Project No. 12404 Date Posted: 05/03/2024
| ||
E.R. Taylor Elementary School and Bryant Elementary School - Water Outlets Remediation, Project No. 12352 Date Posted: 05/03/2024
| ||
Dr. George Washington Carver Elementary School and Grattan Elementary School - Water Outlets Remediation, Project No. 12352 Date Posted: 05/03/2024
| ||
Tule Elk Park Early Education School - Technology Upgrades , Project No. 12386 Date Posted: 05/01/2024
| ||
Sunset Elementary School - Play Yard Chain Link Fence Replacement, Project No. 12402 Date Posted: 03/26/2024
| ||
George Washington High School - Roof Replacement of Portable #3 and Portable #4, Project No. 12363 Date Posted: 03/29/2024
| ||
Sanchez Elementary School - Kiln Room, Project No. 12293 Date Posted: 03/29/2024 | ||
Lowell High School - Main Building Roof Flashing Repairs, Project No. 12408 Date Posted: 03/26/2024
| ||
Junipero Serra Elementary School - Repainting Project, Project No. 12376 Date Posted: 03/19/2024
| ||
Balboa High School - Gymnasium Floor Refinish, Project No. 175 Date Posted: 03/06/2024
| ||
Sherman Elementary School - Play Yard Resurfacing, Project No. 12399 Date Posted: 03/06/2024
| ||
Argonne Early Education School, Jean Parker Elementary School & Commodore Sloat Elementary School Hand Washing Sink Upgrades Package 3B, Project No. 11607 Date Posted: 02/28/2024
| ||
Claire Lilienthal Elementary School (Madison Campus) Hand Washing Sink Upgrades Package 3A, Project No. 11607 Date posted: 02/27/2024
| ||
Alvarado Elementary School - Construction of Two (2) Shade Structures, Project No. 12360 Date posted: 02/26/2024
| ||
Commodore Sloat Elementary School - Exterior Exit Gates, Project No. 12348 Date posted: 02/26/2024
| ||
Balboa High School - Shade Structures for Outdoor Fitness Area, Project No. 175 Date posted: 02/20/2024
| ||
Zaida T. Rodriguez Early Education School, George Moscone Elementary School & Phillip and Sala Burton High School - SNS Hand Washing Sink Upgrades Package No. 2, Project No. 11607 Date posted: 02/22/2024
| ||
John Muir ES, Independence HS, Jefferson EES, Noriega EES, Miraloma ES, Herbert Hoover MS, Remote Door Access System Upgrades - Package 4, Project No. 11970 Date posted: 02/13/2024
| ||
Monroe Elementary School - Accessible Site Improvements of Play Yard, Project No. 12356 Date posted: 01/29/2024
| ||
Commodore Stockton Child Development Center & Rooftop Elementary School - SNS Hand Washing Sink Upgrades Package No. 1, Project No. 11607 Date posted: 1/24/2024
| ||
Archived Bids Balboa High School - Gymnasium Lighting Replacement, Project No. 12359 Date posted: 10/31/2023
Yick Wo ES, Gordon J. Lau ES, Ida B. Wells HS, McAteer Campus, Downtown HS, Remote Door Access System Upgrades - Package 3, Project No. 11970 Date posted: 10/25/2023
San Miguel EES, Former City Arts & Tech, Dolores Huerta ES, Junipero Serra Annex EES, Bret Harte ES, Remote Door Access System Upgrades - Package 2a, Project No. 11970 Date posted: 09/18/2023
Mission High School - Parking Lot Pedestrian Ramp Repairs, Project No. 12357 Date posted: 09/12/2023
Phillip and Sala Burton Academic School, Dr. Martin Luther King Jr Academic MS, Willie L. Brown Jr. MS, Thurgood Marshall Academic HS, Remote Door Access System Upgrades - Package 1C, Project No. 11970 Date posted: 08/17/2023
Gloria R. Davis Campus / 1195 Hudson Senior Center - Sewer Repair / Replacement, Project No. 12353 Date posted: 07/17/2023
Rosa Parks Elementary School - Sewer Repair / Replacement, Project No. 12330 Date posted: 05/12/2023
Presidio Middle School - Sewer Repair / Replacement, Project No. 12329 Date posted: 05/12/2023
Lakeshore Alternative Elementary School - Sewer Repair / Replacement, Project No. 12331 Date posted: 05/12/2023
Herbert Hoover Middle School - Sewer Repair / Replacement, Project No. 12328 Date posted: 05/12/2023
Claire Lilienthal Elementary School, Madison Campus - Repair of Concrete Wall and Fence, Project No. 12323 Date posted: 05/01/2023
Visitacion Valley Middle School - Ceramics Kiln Installation, Project No. 12293 Date posted: 05/01/2023
Everett Middle School - Ceramics Kiln Installation, Project No. 12293 Date posted: 05/01/2023
AP Giannini MS Exterior Maintenance Door Replacement Project, Project No. 11897 Date posted: 04/20/2023
Galileo Academy of Science and Technology - Small Gym Exterior Wall Repairs and Gutter, Project No. 12320 Date posted: 4/12/2023
Lawton Elementary School - Boiler #2, Boiler Sections Replacement, Project No. 12315 Date posted: 04/04/2023
Gloria R. Davis Middle School - Boiler #2, Boiler Sections Replacement, Project No. 12314 Date posted: 04/04/2023
Alvarado Elementary School - Boiler #2, Boiler Sections Replacement, Project No. 12316 Date posted: 04/04/2023
Thomas Edison Charter Academy - Boiler #2, Boiler Sections Replacement, Project No. 12319 Date posted: 04/04/2023
Galileo Academy of Science and Technology - Small Gym Floor Replacement, Project No. 12320 Date posted: 3/21/2023
Malcolm X Academy - Rubber Safety Surfacing Tiles, Project No. 12312 Date posted: 3/31/2023
Jefferson Early Education School - Rubber Safety Surfacing Tiles, Project No. 12327 Date posted: 3/31/2023
E.R. Taylor Elementary School - Acoustical Ceiling At Classroom 17, Project No. 12332 Date posted: 3/22/2023
Galileo Academy of Science and Technology - Skylight Replacement, Project No. 12325 Date posted: 3/13/2023
Sanchez Elementary School - Play Structure Rubber Mat Replacement, Project No. 12326 Date posted: 03/06/2023
Presidio Middle School - Roof Gutter and Downspout Repairs and Replacement, Project No. 12324 Date posted: 03/02/2023
Willie Brown Middle School Gate Replacement Project Date posted: 03/01/2023
Alice Fong Yu Alternative School - Deck Coating Replacement, Project No. 12289 Date posted: 02/28/2023
Miraloma Elementary School - Ceramics Kiln Installation, Project No. 12293 Date posted: 02/28/2023
Cafeteria Painting and Carpentry Work - 8 Schools, Project #11900 Date posted: 02/22/2023
Buena Vista Horace Mann - Interim Public Address System Improvements Project Date posted: 11/01/2022
James Lick MS, Paul Revere ES, Presidio MS, Roosevelt MS and Ruth Asawa School of the Arts - Security Lockset Replacement, Package 4, Project No. 11917 Date posted: 9/7/2022
George Washington High School - Bleacher Railing Repairs and Painting, Project No. 12307 Date posted: 8/22/2022
Bessie Carmichael Elementary School and Bessie Carmichael Middle School - Security Lockset Replacement, Package 1, Project No. 11888 Date posted: 8/9/2022
REBID2: Buena Vista Horace Mann (BVHM) North Courtyard Play Yard Painting, Project No. 11959 Date posted: 06/10/2022
Galileo Academy of Science and Technology - Bleacher Building Repairs, Waterproofing Work, Project No. 12275 Date posted: 5/25/2022
Galileo Academy of Science and Technology - Bleacher Building Repairs, M.E.P. Work, Project No. 12275 Date posted: 5/24/2022
Buena Vista Horace Mann (BVHM) North Courtyard Play Yard Painting, Project No. 11959 Date posted: 05/03/2022
San Miguel Early Education School - South Curtain Wall Shade Installation, Project No. 12302 Date posted: 4/15/2022
Ulloa Elementary School - REBID Accessible Site Improvements of Play Yard, Project No. 12297 Date posted: 4/11/2022
Buena Vista Horace Mann Academic Middle School - Electrical Survey and Phone Line Installation, SFUSD Project Date posted: 4/1/2022
West Portal Elementary School - Accessible Site Improvements of Play Yard, SFUSD Project No. 12298 Date posted: 3/28/2022
Ulloa Elementary School - Accessible Site Improvements of Play Yard, Project No. 12297 Date posted: 3/22/2022
Buena Vista Horace Mann - Ceiling Tiles Replacement, Project No. 11959 Date posted: 2/10/2022
George Peabody Elementary School - Play Yard Resurfacing, Project No. 12290 Date posted: 2/8/2022
Guadalupe Elementary School - Roofing Repairs of Modular Buildings, Project No. 12252 Date posted: 2/7/2022
Balboa High School - Audio-Visual Equipment, Project No. 12160 Date posted: 2/1/2022 Alice Fong Yu Alternative School - Gate and Bench Installation, Project No. 12279 Date posted: 1/13/2022 Guadalupe Elementary School - Roofing Repairs of Modular Buildings, Project No. 12252 Date posted: 11/12/2021
Dolores Huerta Elementary School - Accessible Site Improvements of Play Yard, Project No. 12278 Date posted: 11/10/2021
Jefferson Elementary School - Modular Roof Repairs, Project No. 12253 Date posted: 11/2/2021
Ceramic Kilns Installations at James Lick Middle School (Project No. 11842) and Willie Brown Middle School (Project No. 12230) Date posted: 11/1/2021
Willie M. Brown Middle School - Water Remediation Project, Project No. 12265 Date posted: 10/20/2021
Jose Ortega Elementary School - Accessible Site Improvements of Play Yard, Project No. 12267 Date posted: 9/27/2021
June Jordan School for Equity - Gym Ceiling Installation, Project No. 12270 Date posted: 9/21/2021
Herbert Hoover Middle School - Boiler #1 and #2, Boiler Sections Replacement Date posted: 8/25/2021
Room 124 Repairs at SFUSD Office Building, 135 Van Ness Avenue, Project No. 12272 Date posted: 8/11/2021
School of the Arts (SOTA) - Flooring Replacement Date posted: 7/27/2021
Claire Lilienthal (Scott Campus) School - Exterior Mechanical Unit Sound Barrier Date posted: 7/21/2021
Claire Lilienthal Scott Campus Summer Project - REBID Date posted: 06/10/2021 SOTA Air Balancing Project Date posted: 5/26/2021
George Washington High School - Tennis Courts Improvements, SFUSD Project No. 12262 Date posted: 5/24/2021
Lowell High School - Security Access Improvements, SFUSD Project No. 12263 Date posted: 5/21/2021
Claire Lilienthal Scott Campus Summer Projects Date posted: 5/19/2021
Jefferson Elementary School - Roof Repairs, SFUSD Project No. 12253 Date posted: 5/10/2021
Lowell High School - State A.B. 211 Door Lockset Replacement Project, SFUSD Project No. 12260 Date posted: 4/28/2021
SFUSD Budget Office - Roof Repairs, SFUSD Project No. 12250 Date posted: 4/14/2021
June Jordan School for Equity - Accessible Ramp at Play Yard and Learning Garden, SFUSD Project No. 11953 Date posted: 4/20/2021
Guadalupe Elementary School - Roofing Repairs of Modular Buildings Date posted: 4/8/2021
E.R. Taylor Elementary School - RE-BID of A.D.A. Site Improvement of Play Yard, SFUSD Project No. 12239 Date posted: 3/30/2021
Cafeteria Painting - Group 7, SFUSD Project No. 12182 Date posted: 3/5/2021
E.R. Taylor Elementary School - A.D.A. Site Improvement of Play Yard, SFUSD Project No. 12239 Date posted: 2/25/2021
Balboa High School - Vacuum Boiler Feedwater System Replacement Date posted: 2/17/2021
601 McAllister Street, 2nd Floor Conference Room - Lighting Upgrade Date posted: 1/20/2021
Buena Vista Horace Mann K-8 Community School - Boiler #1, Boiler Sections & Base Replacement Date posted: 1/20/2021
George Washington High School - Fencing Project for Batting Cage Building Date posted: 11/17/2020
George Moscone Elementary School - Play Mat Replacement Date posted: 10/07/2020 2/14/2017 Cafeteria Painting Project at Galileo HS & Dr. Charles Drew ES
01/27/2017 02/14/2017 Alteration of Restrooms at Miraloma ES 01/26/2017 02/10/2017 Security Fence Repairs & Replacement at June Jordan School for Equity 01/24/2017 02/07/2017 West Portal Yard #4 Improvements 01/10/2017 01/25/2017 Tule Elk Park EES Controlled Demolition
12/09/201612/23/2016 Elevator Modernization Project at 601 McAllister Street 12/09/2016 12/22/2016 Security Upgrades of Property Gates at Student Nutrition Services Facility 11/18/201612/02/2016 Fence Repair Project at 1350 7th Avenue
09/15/201609/27/2016 John O'Connell HS - Library Improvements Project 08/31/2016 09/21/2016 Ceramics Kiln Installations at Various Sites, Pkg 2 07/28/2016 08/11/2016 George Washington High School Computer Classroom SH5 07/21/2016 08/02/2016 Doorbell Entry System and Door/Gate Replacement Project at George Peabody & Clarendon Ellementary Schools 07/12/2016 08/02/2016 Doorbell Entry System & Door/Gate Replacement Project at Leonard Flynn & John Muir Elementary Schools 07/12/2016 08/02/2016 Thomas Edison Charter Academy (TECA) Sewer Repair 07/22/201607/29/2016 Utility Ramps and Drainage Improvement Project at Alvarado Elementary School 07/15/2016 07/26/2016 Lower Roof Repairs at Thurgood Marshall High School Gym 07/08/2016 07/21/2016 2nd Floor Carpet Replacement Project @ 555 Franklin Street 05/20/2016 06/01/2016 John McLaren EES - Roof Replacement
05/19/201606/02/2016 Administration & Counselling Offices Floor Replacement Project @ John O'Connell High School 05/16/2016 05/27/2016 Willie L. Brown Jr. Middle School Sidewalk and Fence Project
05/16/201605/26/2016 Cleveland ES - Replacement of Fence Grills
05/04/201605/19/2016 Replacement of Gym Divider Curtain @ Hoover Middle School & Washington High School 04/28/201605/17/2016 McKinley Elementary School Play Yard Upgrade
05/03/201605/12/2016 Security Camera System Project @ Mission Education Center Elementary School 04/19/2016 05/05/2016 Security Camera System Project @ Tule Elk Park Early Education School 04/19/2016 05/05/2016 Playground Safety Surfacing Project @ Dianne Feinstein Elementary School 04/20/201604/29/2016 Playground Resurfacing & Yard Modifications Project @ Guadalupe Elementary School 04/12/2016 04/28/2016 Playstructure Matting & Office Flooring Replacement Project at Tenderloin Elementary School
03/30/2016 04/12/2016 Junipero Serra ES Demolition Project
03/29/201604/19/2016 Daniel Webster Interim Housing at Enola Maxwell Removal Project
03/23/201604/13/2016 Yick Wo ES Green Schoolyard
03/14/201604/05/2016 George Peabody ES Green Schoolyard
03/14/201604/05/2016 McKinley Elementary School Upgrade 03/15/201604/05/2016 3rd Floor Carpet Replacement Project at 555 Franklin St.
01/28/2016 02/09/2016 Cesar Chavez Elementary School - Window Shades Installation
|
This page was last updated on June 24, 2026