George Washington High School

George Washington High School

gwhs
 Front facade of George Washington High School

Site map

George Washington offers its students an outstanding comprehensive education in a culturally rich environment. Students can choose from more than 100 course offerings, with 52 sections of honors and AP classes. Students also have the opportunity to tap into a network of over 50 campus clubs and student groups and a full inter-scholastic athletic program, with 22 teams in 15 sports. Our school mission is that every George Washington High School student will be a lifelong learner who can think critically with a social conscience, and strive to reach their full potential while maintaining mental and physical health. 

Project Dashboard

Project Details

General Information

Architect: Gelfand Partners Architects, Inc
General Contractor: Arntz Builders, Inc.
Construction Manager: AECOM
Bid Amount (Hard Cost): $34,470,933
Change Order Amount: $7,101,657   (20.60% of bid amount)
Final Contract Amount: $41,572,590

Project Description

The work is generally limited to the main classroom administration building. The main scope of work is the voluntary structural strengthening of the main building, which includes: enlarging existing foundation and adding micropiles, installation of concrete shear wall and collector beams. Related scope:

  • Replacement of  finishes impacted by the structural work; replacement of flooring, ceilings, lighting, roofing and skylights;
  • Minor ADA upgrades;
  • Replacement of electrical distribution system on site and in main building, relocation of fire pump and sprinkler heads;
  • Interim housing installation and removal;
  • Replacement of data lines, locksets, locker doors and toilets.

Work in shops building, grandstands, auditorium and gym: replacement of CAT V cables, fiber and copper lines from MDF to IDF’s; routing of data and power conduits through basement of Auditorium.